About Porto Barricata - porto turistico nel cuore del delta del Po
The Porto Barricata of Porto Tolle is located in the heart of the Po Delta National Park and precisely in the southern part of the delta in a magnificent natural landscape where it is possible to discover the placid streams and lagoons protected by the slender sand "stalls" . In this environment live numerous species of sedentary and migratory birds that are easy to meet during excursions: red and gray herons, marsh harriers, black-winged stilts, pink flamingos, which are highly attractive for photography and birdwatching enthusiasts. The structure offers the possibility of excursions on horseback or by bicycle, following the banks to discover the internal landscapes shaped over time by the combined action of nature and man. The port, located in the riverbed of the Po and protected from storm surges, is about 300 meters from the mouth and has 320 berths up to 15 meters in length and offers boaters a wide range of services on land and on the quay in compliance with the environmental sustainability. "It is a reality that has been able to marry hospitality and the offer of quality services with policies for environmental protection - says Serra - and the presence in the heart of the Delta del Pone park recognizes the strong commitment in terms of sustainability . In this environment, contact with nature - concludes Serra - is a rewarding and sought-after attraction by boaters that is well integrated with the uniqueness present in our territories and that the marinas in their role as careful dealers help to protect and protect ".




Facilities
Port Information
Telephone
Berth Sizes
Depth at MLW
Manoeuvrability
Channel Marking
VHF Channel
Port of Entry
Overseas Visitor Berths
Catamaran Berths
Dock Type
Style Side To
Style Stern To
Tidal Flow
Active Winter
Weather Forecast
- E 7–10 knots.
- 26°C
- Calm sea
- UV Index: 0 - Low
- Sunny
- E 6–8 knots veering SE 6-8 knots.
- 26°C
- Calm sea
- UV Index: 7 - High
- Sunny
- SE 7 knots increasing to 10 knots.
- 27°C
- Calm sea
- UV Index: 7 - High
- Sunny